Phoenix Hospital

Project Details

Project Number: J157

Project Name:  Phoenix Hospital

Main Contractor:  Cameron Black

M&E Consultant:  ARUP

Contract Type:  Traditional with CDP

Duration:  May 09 – December 09

Value: £500K-£1Million

Project Description

The building was an existing property that was refurbished for use as a private hospital. The building has one floor at lower ground floor and four above grade levels. The installation includes an operating theatre, reception, day suits, bedrooms along with staff areas & Plant rooms.

Gallery

Scroll to Top